The Power Plant

Results: 4736



#Item
231July 30, 2011 Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Tokyo Electric Power Company Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4  ○Supporti

July 30, 2011 Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Tokyo Electric Power Company Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4 ○Supporti

Add to Reading List

Source URL: www4.tepco.co.jp

Language: English - Date: 2012-03-09 07:10:22
232THE ESSENTIAL GUIDE FOR THE NUCLEAR NEW BUILD SUPPLY CHAIN STAGE TWO MARCH 2013

THE ESSENTIAL GUIDE FOR THE NUCLEAR NEW BUILD SUPPLY CHAIN STAGE TWO MARCH 2013

Add to Reading List

Source URL: www.niauk.org

Language: English - Date: 2014-01-13 07:17:18
233,  Newsletter MayGovernment pressed to hold inquiry into

, Newsletter MayGovernment pressed to hold inquiry into

Add to Reading List

Source URL: stophinkley.org

Language: English - Date: 2010-05-21 09:17:06
234European Nuclear Society YGN

European Nuclear Society YGN

Add to Reading List

Source URL: euronuclear.org

Language: English - Date: 2013-04-02 06:19:57
235GOT WATER? Nuclear power plants are usually built on the shores of lakes, rivers, and oceans.1 This practice is not for the aesthetics such locales provide, but because the readily available water can absorb the waste he

GOT WATER? Nuclear power plants are usually built on the shores of lakes, rivers, and oceans.1 This practice is not for the aesthetics such locales provide, but because the readily available water can absorb the waste he

Add to Reading List

Source URL: www.nirs.org

Language: English - Date: 2008-01-21 21:03:11
236ENEL GREEN POWER BEGINS WORK ON NEW SOLAR POWER PLANT IN SOUTH AFRICA  With a total installed capacity of 82.5 MW, the Pulida facility will be able to generate more than 150 GWh per year once fully operational

ENEL GREEN POWER BEGINS WORK ON NEW SOLAR POWER PLANT IN SOUTH AFRICA  With a total installed capacity of 82.5 MW, the Pulida facility will be able to generate more than 150 GWh per year once fully operational

Add to Reading List

Source URL: www.enel.com

Language: English - Date: 2015-05-21 09:44:55
    237東京電力株式会社福島第一原子力発電所周辺の海水の放射能濃度分布( H-3、全α、全β、Sr) (東京電力(株)の発表をもとに作成※1) 試料採取日:平成27年5月4日、12

    東京電力株式会社福島第一原子力発電所周辺の海水の放射能濃度分布( H-3、全α、全β、Sr) (東京電力(株)の発表をもとに作成※1) 試料採取日:平成27年5月4日、12

    Add to Reading List

    Source URL: radioactivity.nsr.go.jp

    Language: English - Date: 2015-07-15 22:47:25
    238GAO, Nuclear Regulatory Commission: Oversight of Security at Commercial Nuclear Power Plants Needs to Be Strengthened

    GAO, Nuclear Regulatory Commission: Oversight of Security at Commercial Nuclear Power Plants Needs to Be Strengthened

    Add to Reading List

    Source URL: www.nirs.org

    Language: English - Date: 2008-01-21 22:52:53
    239Lessons-Learned from the Research on BWR, and its Applicability to PWR  Extremely Confidential Type

    Lessons-Learned from the Research on BWR, and its Applicability to PWR Extremely Confidential Type

    Add to Reading List

    Source URL: pr.bbt757.com

    Language: English - Date: 2012-04-27 10:14:36
    240Appendix D Appendix D Abbreviations and Terminology availability: the percentage of time that a wind plant is ready to generate (that is, not out of service for maintenance or repairs) balancing cost: system operating co

    Appendix D Appendix D Abbreviations and Terminology availability: the percentage of time that a wind plant is ready to generate (that is, not out of service for maintenance or repairs) balancing cost: system operating co

    Add to Reading List

    Source URL: www.ieawind.org

    Language: English - Date: 2014-09-01 19:14:53